Situation:
The 50mm galvanized potable main-line into the building and header tanks was leaking and flooding the basement of the building. The pipe runs beneath a concrete slab and with-in the basement walls. Replacing the pipe was not an option. Transnet turned to Nu Flow instead.

Solution:
Nu Flow South Africa re-lined the 50mm main-line with an epoxy coating with out having to chop through the concrete slab and basement walls. The job took Nu Flow a fraction of the time that replacing the pipes would have taken.

The end result is a re-lined pipe, repaired from the inside.