Relining pipes at Rosebank Netcare
Customer:
Rosebank Netcare, Rosebank, Johannesburg
Situation:
The hospital had a 20 meter long 50mm Waste Pipes which was constantly blocking up. The pipe runs under a carpeted oor inside one of the doctors rooms and in a wall column on the 1st oor. The hospital did not want to chop open the oor and column to replace the pipe due to the amount of noise, mess and time a traditional pipe replacement would take. The hospital turned to Nu Flow for a better solution.
Solution:
Nu Flow South Africa sandblasted the inside of the pipe cleaned returning the pipe to its full diameter before lining the inside of the pipe. Once the pipe was clean, Nu Flow’s technicians air blasted Nu Flow’s patented epoxy coating through the pipe thereby lining the entire pipe from the inside sealing any leaking points and creating a smooth uniformly distributed coating inside the pipe.
Download pdf of this case study