- Pipe relining at the speed of light -
Nu flow brings UV cured pipe relining technology into the small diameter market, giving you endless working times, less risk on-site, less margin for human error and a far stronger liner. Contact us today for more information.

ADVANTAGES

20 Minute Cure Time
uv aCTIVATED rESIN

A lined pipe can be ready to use again in 1-3 hours from start to finish (dependent on pipeline distance)
This dramatically shortens the time required to rehab piping, which means less downtime in local services for residents.

PRE-IMPREGNATED LINERS
NO MORE MIXING RESINS ON SITE

UV requires less equipment, so site set-up and take-down is quick, making it especially suitable for busy locations like roads, railways, airports, or for sites where there is limited room to move.

Glass Fibre Reinforced Liner
90 DEGREE BENDS & LATERAL CONNECTIONS

Tough, strong and durable lining which dramatically increases the life span of the pipe.
The texture of the liner improves flow efficiency.
- nEW CUTTING EDGE TECHNOLOGY-

CASE STUDIES

READ MORE ABOUT OUR INDIVIDUAL PROJECTS BELOW

Helen Joseph Hospital

  • 80m's of drain pipe relined.
  • Severely damaged pipelines.
  • Lining completed in 1 day. Reinstatement 2 days.

BUILDING IN BOKSBURG

  • Relined 3 x 7.5m PVC pipes.
  • Pipeline joints had shifted.
  • Completed in half a day.

Mercedes Benz

  • Patch repair to central line.
  • Pipeline had rusted away.
  • Completed in 5 hours.

BUILDING IN CENTURION

  • Relined 2 PVC Pipes.
  • Leak damage in the walls.
  • Completed in 2.5 hours.