Relining pipes at Balalaika Hotel, Sandton
Customer:
Balalaika Hotel, Sandton
Problem:
110mm PVC sewer pipe running under passageway leading to hotel rooms was cracked and constantly blocking.
Circumvention::
The sewer pipe had cracks in multiple sections causing constant blockages.
Solution:
Thanks to Nu Flow’s structural lining technology, we were able to reline the cracked pipe using existing manholes as access points, causing absolutely no damage or disturbance to the hotel.