Nu Flow re-lines at De Waterkant Piazza Body Corporate

Location:
De Waterkant Piazza, De Waterkant, Western Cape

Situation:
Nu FLow were called to site to investigate a PVC sewerage pipe that had been join onto a cast iron stack. The fact that there is no glue that can bond these two materials was allowing the water to seep into the stack. Traditional pipe replacement would mean that the garage of the building would need to be chopped open in order to access the affected area. Its no wonder the client opted for Nu Flow pipe re-lining instead!

Solution:
Nu FLow re-lined the space between these two pipe with Nu Flow’s pullin- place structural lining system creating a smooth free flowing pipe.
The re-lining was done working from existing access points thereby causing no damage or distruction to the building.

The end result is a new pipe with in the old pipe.

No Mess, no chopping open, damage to structures!