Interspares – leaking full bore

Location:
Johannesburg, Gauteng

Situation:
Interspares had a 110mm cast iron full bore that was leaking causing water damage to the building. The pipe ran with in the buildings walls from the roof to
the ground floor. Replacing the pipe would cause disruptions to the businesses operations so Interspares turned to Nu Flow for a better solution.

Solution:
African Pipe Re-lining, a Nu Flow licensee first did a CCTV pipe inspection to assess the pipes condition and locate the problem areas. African Pipe Re-lining then used Nu Flow’s pull-in-place structural liners to reline the full bore without having to break through the buildings walls. The company was able to continue with their day-to-day activities while the pipe was been re-lined.

No mess, no noise, no damage!
The end result is a new pipe within the original pipe.

Download pdf of this case study

Read more Commercial case studies