Re-lining on Milton rd, Paarden Eiland

Location:
Milton rd, Paarden Eiland, Western Cape

Situation:
Nu FLow arrived on site to re-line a cracked waste pipe that was constantly causing leakages and blockages to the bathrooms of the first floor of this office building.

As it was a newly renovated building with wooden flooring, removing the floor was not an option

Solution:
Nu FLow used the Nuflow pull-in-place lining system to re-line this pipe ensuring that all the cracks had an epoxy coating to stop the leaks and maintain a constant flow. All of this was done in a matter of hours with no damage or disturbance to the office block.