Case Study - Motus Corporation

Storm Water Rehabilitation Project – DN450 / DN600

Industry / Market: Commercial / Fleet Management, KZN

Client: Motus Corporation

System: Defective concrete stormwater pipelines: 205 meters of DN450mm and 110 meters of DN600mm.

Situation: Nu Flow was contracted to repair the facility stormwater pipelines that were situated on the property vehicles’ storage lots perimeter. Due to damage and the age of the pipelines, when the rains came, the excess rainwater would wash down the embankments and onto the brand-new cars causing damage to the merchandise.

Solution: Using Nu flows patented structural liner, which was inflated in-situ the pipeline and steamed cured. The job took a fraction of the time that traditional pipe replacement would have taken, not forgetting, the costs saved using this technology.

The project took 14 days to complete with 1 team.

The End Result: The pipe is rehabilitated to a better-than-new condition, with an increased flow rate, eliminated weakened joints, and sealed cracks.