Nu Flow re-lines one of Steer & Co’s Buildings in Tamboerskloof

Location:
Warren road, Tamboerskloof, Cape Town, Western Cape, South Africa

Situation:
The 50 year old building was experiencing continual blockages in the cast iron sewerage system.

Traditional pipe replacement methods were not an option for Steer & Co as the pipes run through multiple units of the building encased in solid brick columns. Replacing the pipes would not only be very expensive, but would also result in major damage to the buildings structural integrity.

Steer & Co turned to Nu FLow for a better solution.

Solution:
Nu FLow used Nu Flow’s pull-in-place structural re-lining system to re-line the inside of the pipes working from existing access points thereby causing no damage to the structural integrity of the building.

NO Damage! NO noise! NO Mess!
The end result is a new pipe within the old pipe.