- Pipe relining at the speed of light -

PIPE RELINING AT MERCEDES BENZ

Location:

Mercedes Benz Bedfordview

 Situation:

Nu-Flow was contracted by Mercedes Benz to conduct a CCTV pipeline inspection, unblock one stormwater line and to relined one of the main pipelines at the back of the building.

Replacing the pipeline was not possible since it runs under the building and joints the main sewer system

Solution:
Nu Flow unblock and cleaned out the blocked stormwater line using a high-pressure water jetting. Nu Flow lined the section of main line using UV cure as this method of lining is the quickest and least disruptive.

NO mixing resins on site! 

NO risk of under-cured liners! 

Endless working time!